Site Electrical & Thermal Engineering Consultation
An intensive one-on-one technical consultation and blueprint review session in our Seaton lab to stress-test your proposed commercial or shed mining facility plans before purchasing infrastructure.
Target Audience & Scope
Who this program is for: Commercial shed operators, rural landowners with farm sub-stations, and warehouse managers planning deployments between 20kW and 500kW.
Engineering Scope: Comprehensive load calculations, transformer capacity assessment, hot-aisle/cold-aisle CFD modeling review, switchgear selection, and harmonic distortion mitigation.
Syllabus & Delivery Stages
Phase 1: Pre-Session Data Ingestion
Collection of existing single-line electrical diagrams (SLD), utility supply capacity letters, and building dimension sketches.
Phase 2: Seaton Lab Working Session
Interactive calculation of total harmonic distortion (THD), hot-aisle exhaust velocities, louvre sizing, and backup emergency shutdown interlocks.
Phase 3: Formal Engineering Summary Delivery
Delivery of an itemised engineering advisory dossier detailing recommended cable cross-sections, breaker curves, and airflow static pressure margins.
What Is Included
- 4-hour private bench and schematic review with senior electrical instructor
- Detailed written Thermal & Power Audit Report with calculations
- 3-phase distribution bill of materials review
- Follow-up 45-minute Q&A call 14 days post-consultation
What Is Excluded
- Submission of council development applications
- Direct electrical contracting or physical cable pulling
Participant Logistics
Submit site electrical drawings, utility supply agreements, and intended hardware model list at least 5 business days prior to the session.
Limited to 2 consultation bookings per week to allow adequate report compilation time.
Submit your project details via the consultation request form.